E Condos: June Construction Update

June 15th, 2016

It’s been a while since we last checked in on the progress at eCondos! The last time that we checked in with our site at Yonge and Eglinton was back in not-so-snowy December. Before that, you may recall the video of the raft pour for the crane. We’re excited that a lot has changed since then.

South Tower

Things are really coming together! You can see the south tower has really come along since the last update. In December, we were just hitting ground level or “above grade” and working on vertical walls, columns, and slabs. We’re currently forming the Ground Floor Mezzanine and you can see how that’s shaping up in the photo below!

econdos construction

North Tower

Over in the north tower, we were working on the tiebacks the last time that we checked in on the project. Since then, we’ve moved on to working on the parking. The formwork is progressing at the P1 parking level at the north tower and we’re eager to keep on the building. Things are looking great over on the site.

IMG_1944

Stay tuned for more updates to come!

  • Looking for construction updates on this and other sites? Make sure you’re following along on Twitter!
  • Catch up on our previous E Condos updates right here.
  • Interested in our upcoming projects? Contact us here!